Seeing the Network Through Transit Data

In Week 1, Rivergate recognised a difficult truth. Its adaptive SCATS network was functioning as designed, yet bus reliability was deteriorating. The issue was not congestion alone. It was inconsistency.

Before changing a single signal parameter, the city decided to understand the problem properly.

For years, Rivergate’s Traffic Management Centre and Transit Operations Centre had worked in parallel. Traffic engineers optimised splits, cycle lengths and offsets. Transit operators monitored schedule adherence and headways. Both teams had data. Neither had shared operational visibility in real time.

The breakthrough began with integration, not intervention.

Establishing a Transit Aware Baseline

Rivergate’s buses already transmitted real time location and operational data through AVL systems and SIRI feeds. GPS telemetry provided second by second vehicle positions. Schedule adherence status was available, but it had never been spatially aligned with intersection performance.

A transit visibility layer was introduced alongside the SCATS environment. Importantly, this did not alter adaptive control logic. It provided intelligence.

For the first time, traffic engineers could see:

  • Live bus approach trajectories to specific signal groups
  • Real time lateness, early, on time, or delayed
  • Corridor heat maps highlighting recurring delay clusters
  • Intersection level dwell and stop patterns

The analysis focused on two priority corridors covering 42 signalised intersections.

The results were precise and measurable.

Average bus delay attributable specifically to signal control during peak periods was 68 seconds per intersection.

More significantly, 38 percent of buses already running late were losing additional time at signals, compounding unreliability.

Journey time variability across the corridors measured plus or minus 21 percent. That level of variance, more than absolute delay, was driving passenger dissatisfaction.

Data Changes the Conversation

Within the Traffic Management Centre, the tone shifted.

Previously, discussions around transit priority had been theoretical. Would it degrade progression? Would it cause side street penalties? Would it destabilise adaptive coordination?

Now the team had intersection specific evidence.

David Chen, Senior Signal Engineer, identified a pattern. Delay was not evenly distributed. It clustered at predictable locations during predictable periods, typically where late running buses encountered heavily loaded approaches during peak.

The data suggested something important. Rivergate did not need universal priority. It needed conditional, rules based intervention.

The question became more refined:

What if a priority request were generated only when a bus exceeded a defined lateness threshold, for example three minutes behind schedule? What if that request were restricted to predefined intersections with demonstrated delay impact? What if green extensions were capped to preserve corridor coordination? What if priority were suppressed during oversaturated conditions to avoid gridlock risk?

Rather than overriding SCATS, the city explored informing it.

From Visibility to Action

Elena Martinez summarised the insight during a joint operations review.

“We have spent years optimising flow. We have not optimised reliability.”

The distinction mattered. Adaptive control responds to vehicle demand. Transit reliability requires awareness of schedule performance and passenger impact.

By quantifying where and when signal related delay occurred, Rivergate established a clear operational baseline:

  • 68 seconds average signal delay at key intersections
  • 38 percent of late buses losing additional time at signals
  • 21 percent corridor journey time variability

With this evidence, the city could move beyond assumptions.

The next step would test whether targeted, data driven priority could be integrated into a live SCATS environment without degrading overall network performance.

In Week 3, we explore how Rivergate implemented conditional transit priority within its adaptive control system, and what happened next.

The results were precise and measurable.

Average bus delay attributable specifically to signal control during peak periods was 68 seconds per intersection.

More significantly, 38 percent of buses already running late were losing additional time at signals, compounding unreliability.

Journey time variability across the corridors measured plus or minus 21 percent. That level of variance, more than absolute delay, was driving passenger dissatisfaction.

Nicander

Request a demo

Fill out the form below. We’ll get back to you as soon as possible.

Solutions

We work across a number of sectors globally including Local and National Government, Transport, Emergency Services, and the Private Sector, delivering award winning solutions.